A (Hallade) moment to remember

For the track realignment methods (Hallade or similar) the existing alignment is surveyed by measuring the outer rail offsets (versines) to overlapping chords. One such setup is drawn below: A’, B’, C’ are points on the outer rail of the track and for point B’ the versine B’D’ =  vB ex is measured to the chord A’C’. We…

Checking the versine survey precision

A field measurement of any kind is never exact and intrinsically contains errors (NJDoT Survey Manual – 2014). For track topographical measurements some of these errors are known and eliminated by applying appropriate corrections and compensations. Even after all known errors are eliminated however, a site measurement will still be in error by some unknown value. To minimise the…